I-40: Bellemont to Winona

Design Concept Report and Environmental Studies
Federal Aid No. STP-040-C(BBR)
Project No. 040 CN 183 H7586 01L

Purpose of Project

To develop a long-range plan to provide added capacity to and improve operations on I-40 from Milepost (MP) 183 to MP 214.

Project Description

The Arizona Department of Transportation and the Federal Highway Administration, as lead federal agency, are conducting engineering and environmental studies to develop a long-range plan for the improvement of the Interstate 40 corridor west of the Bellemont traffic interchange to east of the Winona traffic interchange. This section of the I-40 corridor runs through the city limits of Flagstaff. A series of improvements will be developed to provide for greater capacity and to ensure smooth operations for the traffic volumes that are projected to occur over the next 30 years. The design concept report will consider roadway, bridge, and drainage improvements. Environmental issues will also be assessed. When the reports are complete, potential projects will be identified and priorities established for future inclusion in ADOT’s construction program when funding is available.

Public Meetings

August 5, 2010
Meeting Advertisement
Save the Date Post Card
Meeting Presentation
Comment Form
 
July 14, 2009

Study Map

Meeting Advertisement
Save the Date Post Card

Meeting Presentation

Frequently Asked Questions
Comment Form
Survey Form
Scoping Summary


Study Timeline

Summer 2009 - Winter 2009
  Develop & evaluate alternatives, prepare environmental overview
   

Winter 2009 - Summer 2010

  Public information meeting to present alternatives
   
  Prepare engineering and environmental documents
   
Fall 2010
  Public hearing to present recommended alternative
   
Winter 2010 - 2011
  Finalize documents; agency acceptance


Information Links


Key Team Member Contacts

Key members of the project team to contact for information:
Mackenzie Nuño  
Public Information Officer 928.525.6494 phone
ADOT Communication and Community Partnerships 928.537 3545 fax
   
Jackie Noblitt  
Design Project Manager 602.333.2401 phone
Stanley Consultants Inc. 602.333.2333 fax
   
Heather Honsberger  
Public Involvement Coordinator 602.792.8802 phone
HDR Inc. 602.385.1620 fax


Contact Information
Public Involvement Coordinator
Heather Honsberger
HDR Inc.
101 N. 1st Avenue,
Suite 1950
Phoenix, AZ 85003

Phone 1.602.792.8802
Fax 602.385.1620

Privacy Statement | Contact ADOT
© Copyright Arizona Department of Transportation. All Rights Reserved